Mercia Garden Products

  • Client

    Mercia Garden Products
  • Sector

    Private
  • Role

    Environmental and Sustainability / Drone Survey
  • Property type

    Industrial

Description

We completed an initial Site Condition survey in connection with the client’s application for an Integrated Pollution Prevention and Control (IPPC) permit for a new proposed timber treatment process at their existing facility. 

As the site condition survey highlighted potential historical sources of contamination on the application site, a baseline investigation was required as part of the application.  The investigation included rotary boreholes, soil sampling, gas and groundwater monitoring and laboratory analysis.

Using Paragon’s in-house drone, we also created a topographical survey, contour plot and photogrammetry images to support the assessment.

Paragon interpreted the results and produced a report that was submitted to the Local Authority to support the IPPC application.

Back to listing