Riverside House

  • Client

    ADAM Asset Management
  • Sector

    Fund
  • Role

    Project Management / Cost Management / Environmental and Sustainability
  • Property type

    Commercial
  • Construction period

    16 months
  • Completion date

    August 2020

Description

Cat A refurbishment of 82,000 sq ft of existing office accommodation including full replacement of landlord’s plant around an existing tenant to serve 183,910 sq ft.

Work also included extension works to increase the NIA by 10,000 sq ft with external terrace space, introduction of a secondary reception at river level, new shower and changing rooms, refurbishment of the existing reception to incorporate coworking space, refurbishment of all WC’s and common parts and enhancement of existing balcony terraces.

In connection with the site’s refurbishment and extension, environmental assessments were required by the Local Planning Authority and Paragon completed an Air Quality Assessment and a Flood Risk Assessment.

Back to listing